hyperspace

Rollout of the Agentic OS

2026-03-01 → 2026-04-30 · 3 repos · every release, every post

299releases
2.4Mlines of code
612ship entries
Activity42 days shipped24 days posted
FebMarApr
MonWedFriSun
LessMore releasesTweets
Earlier activity (34 tweets, Oct 2023 – Feb 2026)
Oct '23Nov '23Dec '23Jan '24Feb '24Mar '24Apr '24May '24Jun '24Jul '24Aug '24Sep '24Oct '24Nov '24Dec '24Jan '25Feb '25Mar '25Apr '25May '25Jun '25Jul '25Aug '25Sep '25Oct '25Nov '25Dec '25JanFeb
MonWedFriSun
March 2026 — vs. major AI labs
Campaign aggregate views and bookmarks — Hyperspace vs major AI labs, March 2026
4.6M views29K bookmarks19K likes55 posts · zero ad spend
Jump to month
April 202635 entries

Eight new *.hyper.space sites + HyperSearch local-first cascade + agent-infra parity

Show full shiplog

Eight product landing pages shipped in a single day, three search/embed packages dropped as drop-in replacements for incumbents, and the on-device agent-infrastructure set closed E2B/Dedalus/Arcade gaps. All chalkboard-diagram convention with Grok-Imagine-generated artwork.

Sites — eight new subdomains

  • [THOR] models.hyper.space — full universe of agent-reachable models (23 catalog + cloud routes + heterogeneous engine sharding).
  • [THOR] vectors.hyper.space — 428M+ public corpus (Wikipedia, ArXiv, Reddit, PubMed) + uploads + pod-shared collections; 10 chalkboard diagrams.
  • [THOR] tools.hyper.space — Unified Tool Graph: every callable surface (CLI, MCP, OpenAPI, gRPC) by URI, AVM-checked.
  • [THOR] skills.hyper.space — SKILL.md registry, network-wide search and install, pod-shared libraries.
  • [THOR] search.hyper.space — HyperSearch local-first cascade landing + chalkboard diagrams.
  • [THOR] filesystem.hyper.space — agent filesystem Mesa-shim landing + chalkboard diagrams.
  • [THOR] wallet.hyper.space — HD-derived wallet per agent; SDK + deploy automation.
  • [THOR] sandbox.hyper.space — on-device E2B/Dedalus/Arcade-parity sandbox.

Search — local-first cascade

  • [THOR] search-sdk@2.1.0 — local-first cascade with optional apiKey and gateway fallback; cost receipts on every request; /v1/{answer,research,version} stable.
  • [THOR] search-graph — typed DAG orchestrator, 18/18 smoke tests.
  • [THOR] exa-compat + parallel-compat — drop-in replacements for exa-js and parallel-web. Existing call sites switch by changing one URL.
  • [THOR] api-server — cost receipts wired into all surfaces; /v1/answer, /v1/research, /v1/version endpoints stable.

SDKs

  • [THOR] fs-sdk — @hyperspace/fs Mesa-shim SDK + hyperspace fs CLI. Per-agent persistent storage that survives capsule moves.
  • [THOR] wallet-sdk — Hyperspace Wallet SDKs + site + deploy automation. Node + Python SDKs released to npm + PyPI.
  • [THOR] Agent infrastructure parity — 4 packages closing Compresr/Moda/GodHands/browser-use gaps: compress (72 tests), observe (55), agent-computer determinism (33), browser-sdk (23). 183 tests green; full CLI + MCP + /v1/* API + agent-brain integration.
  • [THOR] On-device agent infrastructure — sandbox SDK + MCP gateway + auth vault + agents SDK. Closes the E2B / Dedalus / Arcade gap on-device.

Misc

  • [THOR] Compound-loop demo + agents migration tutorial (search docs).

AVM as CLI sidecar (v5.40.0) + Agent Mail + email.hyper.space

v5.40.11v5.40.0v2.1.2v5.40.1v5.40.2v5.40.3v5.40.4v5.40.5v5.40.6v5.40.7v5.40.8v5.40.9
Show full shiplog

AVM bundled into the CLI as a managed sidecar; eleven hardening releases through v5.40.11; Agent Mail shipped end-to-end with a federation-first delivery path that skips SMTP for agent-to-agent traffic.

CLI — v5.40.x cascade

  • [P2P] v5.40.0 — avmd security gate as a CLI sidecar. Bundles avmd v2.1.2 inside the standard install.
  • [P2P] v5.40.1 — fix avmd bundling tar permissions.
  • [P2P] v5.40.2 — relay-reservation stability + invite robustness.
  • [P2P] v5.40.3 — pod doctor, invite introspect, reachability state, sticky bootstraps.
  • [P2P] v5.40.4 — synthetic-relay redeem fallback.
  • [P2P] v5.40.5 — single-node fallback + auto-shard on member change.
  • [P2P] v5.40.6 — embed pod_name + pod_slug in invite tokens.
  • [P2P] v5.40.7 — fix cross-shard libp2p mesh after pod-raft migration.
  • [P2P] v5.40.8 — CI throughput optimizations.
  • [P2P] v5.40.9 — fix v5.40.7 FSM-poll mesh seed (dynamic import broke in SEA).
  • [P2P] v5.40.10 — pod-raft uses dedicated libp2p identity.
  • [P2P] v5.40.11 — pod-raft identity migration: safe-by-default.
  • [P2P] v5.39.9 — embed relay multiaddrs in invites, harden HYPERSPACE_PUBLIC_IP, observable rendezvous.

AVM — signed updates wired up

  • [AVM] avmd v2.1.1 — wire up signed-update infrastructure end-to-end (Ed25519 manifest + atomic swap).
  • [AVM] avmd v2.1.2 — build linux on ubuntu-22.04 (GLIBC 2.35) for portability across distros.
  • [AVM] Encrypted backup of release-signing key committed.

Mail — every agent gets a mailbox

  • [THOR] Agent Mail — CLI + SDKs + Cloudflare Email Worker + DNS install. Every agent and every pod gets a mailbox at *@<thing>.hyperspace.sh. Federation-first delivery: agent-to-agent skips SMTP and rides cryptographically-signed Ed25519 envelopes. Three tiers (free / pro / self-hosted). AgentMail-API compatible — change one URL.
  • [THOR] email.hyper.space — informative landing page for Agent Mail; six chalkboard diagrams via Grok Imagine.

AVM neurosymbolic + auto-update RCA (v5.39.7/v5.39.8)

v5.39.7v5.39.8v2.1.0
Show full shiplog

AVM gained a neurosymbolic gate (rules first, ML advisory) and a 200K-row training corpus for avm-classifier-7b. The 13-min restart loop on old installs from earlier in the week was rooted out and fixed in two releases; smoke tests now run in CI.

CLI — auto-update incident

  • [P2P] v5.39.7 — break auto-update infinite restart loop. Bundle path was no-op'ing the SEA, causing a 13-min restart loop on all old installs.
  • [P2P] v5.39.8 — bundle path actually upgrades the SEA + harden systemd unit + post-release smoke test in CI.

AVM — neurosymbolic + classifier training

  • [AVM] avmd v2.1.0 — neurosymbolic gate + adversarial-corpus generator. Rules first, ML advisory: ML can restrict, ML cannot relax, block always wins.
  • [AVM] avm-classifier-7b training scaffold — Qwen 2.5 7B + LoRA, 200K-row mixed corpus (regex mutation, frontier adversarial, compositional, real opt-in traces, boring negatives).
  • [AVM] Tier A — aarch64 seccomp + behavioral persistence + MCP tests + gzip rotation test.
  • [AVM] Tier B + Tier C — operator CLI extensions + CI hardening.
  • [AVM] TS + Python SDKs + agent-computer bridge + cloud-daemon design notes.
  • [AVM] Outbound proxy + adversarial corpus + CI release + policy lint + threat model.
  • [AVM] defs hot-reload safety + TOCTOU integration tests.
  • [AVM] TELEMETRY.md contract + cargo-fuzz harness.

Sites

  • [THOR] avm.hyper.space rebuilt — full feature documentation; 11 chalkboard diagrams via Grok Imagine; neurosymbolic framing.

AgenticOS: 26 Tier-1 Sidecars

Show full shiplog

The Hyperspace CLI now manages 26 independently versioned sidecar processes — each auto-updateable, SHA256-verified, with auto-rollback on handshake failure.

hyperspace service list      — show all 26 sidecars and status
hyperspace service update    — check for updates across all
hyperspace service status    — health check all running

Core Compute & Transport (5)

  • Network (com.hyperspace.network) — libp2p P2P transport: gossip, DHT, relay, QUIC+mDNS+UPnP. The backbone connecting all nodes. Every other sidecar depends on this.
  • Inference (com.hyperspace.inference) — Model execution: llama.cpp, Ollama, MLX. Runs LLM inference locally (GPU or CPU). VRAM management, model loading/unloading.
  • Vectors (com.hyperspace.vectors) — Embeddings + HNSW vector index + crawl-to-ingest pipeline. Powers semantic search across agents, skills, and user data.
  • Storage (com.hyperspace.storage) — DHT content blocks, replication, and storage proofs. Content-addressed persistence with erasure coding across the P2P network.
  • Cache (com.hyperspace.cache) — 3-tier distributed cache: response cache (hash→full response), KV prefix cache (attention state), and routing cache.

Knowledge & Retrieval (3)

  • Search (com.hyperspace.search) — Query layer: parse, rank, verticals, and UI. Powers hyperspace search.
  • Context (com.hyperspace.context) — Shared agent-authored memory and notes. Per-agent knowledge base persisting across sessions.
  • Proxy (com.hyperspace.proxy) — Residential IP fabric for agent web fetches via P2P proxy peers.

Sensitive & Isolated (2)

  • Wallet (com.hyperspace.wallet) — Signing and payments. Process-isolated, Unix-socket communication for defense-in-depth. Manages Ethereum keys and micropayment channels.
  • AVM (com.hyperspace.avm) — Security gate: injection scanning, ACLs, sandboxing, and audit logging. Ships as independent binary (avmd).

Coordination & State (4)

  • Pulse (com.hyperspace.pulse) — Merkle trees, proofs, and points pipeline. Cryptographic proofs of work for the points ledger.
  • Pod-Raft (com.hyperspace.pod-raft) — Go binary. Raft-backed pod state coordinator maintaining consensus across pod members.
  • Blockchain (com.hyperspace.blockchain) — Chain node: fullnode, miner, router, relay with auto-update. The Hyperspace L1 for on-chain settlement and governance.
  • Training (com.hyperspace.training) — Federated and distributed training worker. GPU workloads for DPO, SFT, and RLHF across pod members.

Intelligence & Cognition (3)

  • Agent-Brain (com.hyperspace.agent-brain) — Autonomous cognitive loop (SOUL + MEMORY) on a 30-second cycle. Runs independently so a crash doesn't take down networking.
  • Prometheus (com.hyperspace.prometheus) — On-device cognitive AGI engine, 7 hot-swappable modules. Sandboxed with neutralized child_process and blocked outbound HTTP.
  • Workflows (com.hyperspace.workflows) — Job scheduler for autoresearch, autofinance, autoweb plugins. Dynamic plugin loading with retry logic.

Thor Integration (5)

  • Thor-Runtime (com.hyperspace.thor-runtime) — Local Thor agent orchestration: ODIN classifier, Queen coordinator, Turbo agentic loop.
  • Thor-Bridge (com.hyperspace.thor-bridge) — Thor cloud client: authentication, token refresh, local-to-cloud routing, offline fallback.
  • Thor-Local-Bridge (com.hyperspace.thor-local-bridge) — Browser-extension daemon (port 19532). Email and calendar local-LLM pipelines.
  • Thor-Passport (com.hyperspace.thor-passport) — NEW. Agent identity sidecar. Ed25519 keypairs via HKDF, W3C Verifiable Credentials as agent passports. Port 8790.
  • Thor-Computer (com.hyperspace.thor-computer) — NEW. Agent workspace sidecar. Local VMs (QEMU on Linux, Lima on macOS) for sandboxed exec, file I/O, screenshots, checkpoints, preview URLs. Port 8791.

Scale Infrastructure (4)

  • Catalog (com.hyperspace.catalog) — Index server for agents, skill packs, and MCP servers. Signed index with P2P replication. 1,000+ agents, 100,000+ skills.
  • Skill-Matrix (com.hyperspace.skill-matrix) — Selector model picking top-K skills from 100,000+ per task via trained retrieval.
  • MCP-Host (com.hyperspace.mcp-host) — Lifecycle manager for 200+ on-demand MCP server processes. Spawn, idle, hot-swap.
  • Plugin-Runtime (com.hyperspace.plugin-runtime) — Sandbox host for agent modules and untrusted plugins (Deno or Firecracker).

Build pipeline: 17 standard SEA (generic builder) · 4 core SEA (custom builders) · 4 custom SEA · 1 Go binary (pod-raft) · 2 external downloads (AVM, blockchain). All registered in manifests.ts and managed by ServiceBinaryManager.

v5.37.0 "Pied Piper" + Chain v1.7.0 Mysticeti 1.5s finality + agent workspace

v5.37.0v1.7.0v1.6.9
Show full shiplog
  • [P2P] v5.37.0 "Pied Piper" — hyperspace code coding agent (Pi + Qwen) + parallel search + deploy command.
  • [P2P] Fix: Qwen 3.5 multimodal MLX shard architecture support.
  • [P2P] Lightweight bundle updates + release flow hardening; bundle mlx/torch shard server scripts in release tar.
  • [P2P] Auto-launch blockchain fullnode on hyperspace start.
  • [P2P] Fix: zero-config shard inference across any network; publisher was truncating peer IDs to 16 chars; pod shard command falls back to Supabase heartbeats.
  • [P2P] P2P-first capability discovery — heartbeats before servers.
  • [P2P] Fix: blockchain download step non-fatal on all platforms.
  • [CHAIN] Chain v1.7.0 — BlockSTM deadlock was root cause — Mysticeti 1.5s finality restored.
  • [CHAIN] Chain v1.6.9 — cert pull + sync skip + single-flight + quorum clock.
  • [THOR] Unified persistent workspace for agents — 11 tools, 2,878 LOC. Local-first workspace routing + resource intelligence.

Cross-shard pipeline parallelism + A1 blockchain sidecar + GossipSub bridge

v5.36.4v5.36.3v5.36.2v5.36.1v5.36.0v5.35.9v5.35.7v1.6.7v1.6.6
Show full shiplog
  • [P2P] v5.36.4 — cross-shard pipeline parallelism + A1 blockchain sidecar bundled.
  • [P2P] v5.36.3 — A1 blockchain validators as bootstrap peers.
  • [P2P] v5.36.2 — fix Qwen 3.x MLX sharding.
  • [P2P] v5.36.1 — shard activate endpoint fix.
  • [P2P] v5.36.0 — network interface auto-detect (WiFi/hotspot switch) + fix reasoning_content.
  • [P2P] v5.35.9 — RPC-first distributed inference + pre-warm on activation.
  • [P2P] Fix: RPC mode reuse rpc-server + wait for model loading; GGUF magic byte + shard path fallback + symlink setup.
  • [P2P] v5.35.7 — skip HF download when local GGUF exists.
  • [CHAIN] Chain v1.6.7 — GossipSub bridge runs on ALL nodes; DNS-based bootstrap + bare-addr connect; persistent libp2p identity + validator mesh bootstrap.
  • [CHAIN] Chain v1.6.6 — suppress repeated whitelist fetch failure warnings.
  • [THOR] Computer-use first-class in main turbo loop (CUA + Ironman integration).

Heterogeneous engine sharding + pod sidecars + pods.hyper.space

v5.35.6v5.35.5v5.35.4v5.35.3v5.35.2v5.35.1v5.35.0v5.34.3v1.6.5
Show full shiplog
  • [P2P] v5.35.6 — heterogeneous engine sharding (MLX + CUDA in one ring).
  • [P2P] v5.35.5 — keep WSS/443 fallback for restrictive networks.
  • [P2P] v5.35.4 — pod sidecar + inference sidecar distributed inference. Standalone pod membership + heartbeat process. Distributed inference IPC protocol.
  • [P2P] v5.35.3 — auto-rejoin raft on restart + GGUF auto-detect. LD_LIBRARY_PATH + external server registration + timeouts.
  • [P2P] v5.35.2 — complete distributed inference fix.
  • [P2P] v5.35.1 — fix distributed inference activation + shard planner enrichment.
  • [P2P] v5.35.0 — pod link + models on pod page + tok/s metrics.
  • [P2P] pods.hyper.space documentation site launched — comprehensive 916-line docs.
  • [P2P] v5.34.3 — preserve CUDA-from-source binary across updates.
  • [P2P] Animated shard ring visualization on hyperspace.sh; replaced with clean card layout.
  • [CHAIN] Chain v1.6.5 — skip gate after fast-forward, prevent DAG deadlock.
  • [THOR] Redirect changelog.hyper.space/pods → pods.hyper.space.

AgenticOS production-complete + CUDA build-from-source + pod dashboard

v5.34.2v5.34.1v5.34.0v5.33.4v5.33.3v5.33.2v5.33.1v5.33.0v5.32.1v5.32.0
Show full shiplog
  • [P2P] v5.34.2 — fix auto-update re-exec to use installed binary path.
  • [P2P] v5.34.1 — direct llama-server proxy + 16k default context.
  • [P2P] v5.34.0 — CUDA build-from-source, HF model pull, pod identity mapping.
  • [P2P] hyperspace pod link — secure local→cloud pod linking.
  • [P2P] hyperspace.sh: Next.js pod dashboard + slim CF Worker to API-only; one-click dashboard activation; OAuth redirect for pod subdomains.
  • [P2P] v5.33.4 — pod ring runtime on restart + force shard + member discovery.
  • [P2P] v5.33.3 — pod keys create for local-mode pods (leader-signed key.mint).
  • [P2P] v5.33.2 — local pod API routing fix + Qwen3.6-27B sharding + MCP service tools.
  • [P2P] v5.33.1 — fix local pod API routing + MCP service tools.
  • [P2P] v5.33.0 — MCP discoverability + install-service hint + help tool.
  • [P2P] v5.32.1 — re-release with CI @types/node fix.
  • [P2P] v5.32.0 — AgenticOS production-complete (Phases A/B/C/D/E). Full libp2p integration for storage, proxy, swarm primitives. Node-manager activates fabric at boot.
  • [THOR] Pod API: POST /api/pod/link — heartbeat-verified pod linking.

AgenticOS Phase A→C + distributed inference layer-sharding + pod page publishing

v5.31.1v5.31.0v5.30.9v5.30.8v5.30.7v5.30.6
Show full shiplog
  • [P2P] AgenticOS Phase A P0 gaps closed — inter-registry wiring, real downloads, minisign, strict handshake, seed catalog, management API.
  • [P2P] AgenticOS Phase B — persistence for wallet, storage, context (restart-safe). Vectors, search, skill-matrix persistence.
  • [P2P] AgenticOS Phase C — audit log, CLI lock, provider circuit breakers. 13 P1 items complete.
  • [P2P] AgenticOS: full framework — 24 services, 4 manifest tiers, catalog indirection. 10 functional Tier-1 sidecars. Module agent invocation end-to-end.
  • [P2P] v5.31.1 — agent-brain subprocess isolation (opt-in) + TOCTOU crash fix.
  • [P2P] v5.31.0 — distributed inference layer-sharding across pods. Heterogeneous pod devices, realtime shard/inference status on pod page.
  • [P2P] v5.30.9 — redeem writes pod.json + local shard plan.
  • [P2P] v5.30.8 — local shard plan + heartbeat fix + auto-publisher.
  • [P2P] v5.30.7 — fix heartbeat 404 + auto-publisher on pod join.
  • [P2P] v5.30.6 — auto-start publisher on mid-run pod join.
  • [P2P] Pod page auto-freshness — cache invalidation + stale cleanup + offline marking. State API reads from Supabase instead of stale KV.
  • [P2P] Sidecar: production hardening — stable refs, state preservation, reconnect. Durability hardening + direct-inference channel.

Pod-raft clock drift fix + sidecar wiring

v5.30.4v1.6.4
  • [P2P] v5.30.4 — pod-raft clock drift fix + sidecar wiring. Fall back to wall clock when log.AppendedAt is stale.
  • [P2P] Wire 3 sidecars into NodeManager + adapters + tests.
  • [P2P] Revert sidecar to opt-in — IPC crashes on macOS SEA binary.
  • [CHAIN] Chain v1.6.4 — loose block acceptance + fast-forward restore.

Network sidecar architecture + QUIC + mDNS + UPnP + marketplace

v5.29.1v5.29.0v5.28.5v5.28.3v5.28.2v5.28.0v5.27.10v5.27.9v5.27.8v5.27.7v5.27.6v5.27.5
Show full shiplog
  • [P2P] v5.29.1 — standalone network sidecar binary.
  • [P2P] v5.29.0 — network sidecar, mDNS, UPnP, QUIC-first, relay fix. Isolate P2P from model loading.
  • [P2P] v5.28.5 — QUIC-first transport, mDNS, UPnP. Prefer QUIC over TCP for all connections.
  • [P2P] v5.28.3 — restore circuit relay for NAT'd nodes.
  • [P2P] v5.28.2 — protocol registration before agent init (critical fix).
  • [P2P] v5.28.0 — static import fix for P2P protocol handler.
  • [P2P] Pod-local KV prefix cache (Tier 0.4) + PrfaaS routing primitives.
  • [P2P] v5.27.10 — 5min publish cadence + KV limit fix.
  • [P2P] v5.27.9 — pod-raft drift check uses leader wall-clock.
  • [P2P] v5.27.8 — marketplace auto-publish + dashboard integration.
  • [P2P] v5.27.7 — federated inference marketplace — Vickrey auctions between pods.
  • [P2P] v5.27.6 — live pod dashboard at /dashboard.
  • [P2P] v5.27.5 — model swarm protocol — P2P weight distribution from pod peers.
  • [P2P] v5.27.4 — erasure-coding primitive (XOR parity) for model-weight durability.
  • [P2P] v5.27.3 — MoE expert-parallel placement planner.
  • [P2P] v5.27.2 — QUIC transport for intra-pod RPC + low-latency dial.
  • [P2P] v5.27.1 — ring health monitor + auto-reshard on member drop.
  • [P2P] v5.27.0 — pod reliability + observability batch — trace, retry, unified coord encoding.
  • [P2P] v5.26.6 — AutoNAT + public-node circuit-listen skip.
  • [P2P] v5.26.4 — pod DHT rendezvous + correct relay-listen path.
  • [P2P] v5.26.3 — openStream 20s relay timeout + ping-close hysteresis.
  • [P2P] v5.26.2 — cloud provider detection + macOS desktop fix.
  • [P2P] v5.26.1 — guaranteed protocol registration via timer.
  • [CHAIN] Chain v1.6.3 — direct commit + 100 txs/block + idempotent insert.
  • [CHAIN] Chain v1.6.2 — idempotent InsertBlock, prevent sync/consensus race.
  • [CHAIN] Chain v1.6.1 — merge FullTxData in batched commits — txs flowing.
  • [CHAIN] Chain v1.6.0 — commit rule fixes — 183 commits/min, zero force-commits.
  • [CHAIN] Chain v1.5.9 — deterministic block construction — DAG-carried txs.
  • [CHAIN] Chain v1.5.8 — deterministic coinbase — use blockNumber not decision.Round.
  • [THOR] Terminal computer-use without vision — wterm DOM terminals + a11y snapshot tools.

Thor↔Raft bridge + hyperspace.sh + network resilience

v5.26.0v5.25.4v5.25.3v5.25.2v5.22.7v5.22.6v5.22.4
Show full shiplog
  • [P2P] v5.26.0 — Thor↔Raft bridge + web invite URLs + join page.
  • [P2P] v5.25.4 — pod-coord healthcheck + diagnostic logging.
  • [P2P] v5.25.3 — rich pod page with network graph, machine specs, live inference.
  • [P2P] v5.25.2 — per-node pod page publishing + white colors.
  • [P2P] hyperspace.sh landing page — pod creation + slug check + active pods. Google auth + authenticated pod creation. Slug ownership (first-come-first-served).
  • [P2P] v5.22.7 — inference quality gate for relay connections.
  • [P2P] v5.22.6 — network resilience fixes for cross-network pods.
  • [P2P] v5.22.4 — fix pod-raft HTTP/TLS mismatch.
  • [P2P] Migrate bootstrap infra to DigitalOcean + fix pod-coord P2P protocol registration.
  • [P2P] Fix: prevent stale /usr/local/bin binary from shadowing new install.

Distributed training breakthrough + consensus hardening

v5.20.0v1.5.4v1.5.5v1.5.6v1.5.7
Show full shiplog
  • [P2P] v5.20.0 — Parcae-inspired gradient pooling + adaptive inner steps. Layer gradient pooling groups transformer layers into blocks of 6, averages gradients within each block. Combined with SparseLoCo: 195× total compression (5.5 MB → 28 KB). Adaptive inner steps benchmark hardware speed per node and compute optimal step count to fill the 25-min training budget — fast GPU nodes do 100+ steps, slow CPU nodes do 5–10.
  • [P2P] Exponential backoff retry for training worker failures — 129 of 202 nodes were stuck in a fail→retry→fail loop; now backs off (1m, 2m, 4m, 8m, 16m, max 30m).
  • [CHAIN] Chain v1.5.4 — frontier force-skip + write-continue transport.
  • [CHAIN] Chain v1.5.5 — force-commit + 2s EVM exec timeout — SUSTAINED block production. Root cause: EVM executing 2,878 pending txs blocked for 60s per block.
  • [CHAIN] Chain v1.5.6 — 10s commit timeout + force-commit blocks (263 blocks/min burst).
  • [CHAIN] Chain v1.5.7 — revert to 60s timeout for sustained 3 blocks/min production. Inner function needs ~20s due to InsertBlock mutex contention with sync handler.

Engineering update — 2 Thor · 4 Chain · 2 P2P

v1.4.9v1.5.0v1.5.1v1.5.2
Show full shiplog
  • [P2P] SparseLoCo gradient compression — ~50× improvement over SVD; bump TRAINING_WORKER_VERSION to deploy.
  • [P2P] pod-raft — Raft-backed pod state coordinator (replaces Supabase for pod-internal coordination). Invites + graceful leave + libp2p transport (option B), lockfile + @types/node hygiene, TS-only build script, force- redeploy train.py.
  • [CHAIN] Chain v1.4.9 — bootnode relay + persistent pending retry.
  • [CHAIN] Chain v1.5.0 — direct HTTP block send + dedup relay + simple 2f+1 gate.
  • [CHAIN] Chain v1.5.1 — increase writeCh 256 → 10K + permanent reconnect + pending prune.
  • [CHAIN] Chain v1.5.2 — write deadline + instrumentation for TCP debugging.
  • [THOR] pod-raft-bridge — wire Thor pod-api to consult pod-raft for authoritative state.
  • [THOR] Architecture docs: pod-as-hyperspace + universal inference control plane; Agentic-OS Image reframe grounded in prior Metal work; parent CLI + dual auto-updating sidecars (p2pd and kerneld); evidence-based sidecar plan — llama / ollama belong in engined.

Engineering update — 28 Thor · 8 Chain · 12 P2P

v5.19.0v5.19.1v1.3.13v1.4.4v5.19.2v5.19.3v5.19.4v1.4.1v1.4.2v1.4.3v1.4.5v1.4.6
Show full shiplog
  • [P2P] v5.19.0 — expose full Hyperspace CLI as MCP tools for Claude Code.
  • [P2P] v5.19.1 — bump chain binary v1.3.13 → v1.4.4.
  • [P2P] v5.19.2 — send only LoRA layers to /load-weights (not metadata).
  • [P2P] v5.19.3 — seamless auth: bridge hyperspace login → pod commands; magic invite links.
  • [P2P] v5.19.4 — build fixes, pod event category, Thor URL update.
  • [P2P] Reconstruct SVD to flat weights before /load-weights POST.
  • [P2P] Detached training worker survives CLI restarts.
  • [P2P] pod providers, pod budgets, pod usage commands for shared cloud AI.
  • [P2P] --provisioned mode for OpenRouter native sub-keys.
  • [P2P] device-link — CLI heartbeats to user account + polls remote commands.
  • [P2P] MCP: 4 sandbox tools + 2 OAuth-passthrough tools.
  • [P2P] Training-worker health-timeout: start HTTP server before model load.
  • [CHAIN] Chain v1.4.1 — 400 ms finality (DAG timing matched to Sui Mysticeti).
  • [CHAIN] Chain v1.4.2 — leader-aware clock + block fetch — architectural fix for commit stalls.
  • [CHAIN] Chain v1.4.3 — leader-aware threshold clock — require leader block before advancing.
  • [CHAIN] Chain v1.4.4 — guard empty validator address in SetChainHealth.
  • [CHAIN] Chain v1.4.5 — txpool drain in Mysticeti mode + off-chain payment driver.
  • [CHAIN] Chain v1.4.6 — 246 ms finality (buildIncludes fix + all-validators gate).
  • [CHAIN] Chain v1.4.7 — DAG sync protocol (pull-based block fetching).
  • [CHAIN] Chain v1.4.8 — comprehensive Mysticeti fixes: DAG sync + fast-forward + adaptive gate.
  • [THOR] Automation stack — zero-input, ambient, goal, batch, self-heal; auto-execute accepted proposals via sessionExecutor.
  • [THOR] Pods — shared cloud AI: providers + per-member budgets + unified gateway.
  • [THOR] Magic invite landing + inference-rental marketplace.
  • [THOR] Reuse existing openrouter-service for native sub-key provisioning.
  • [THOR] /me — unified AI access command center; inline Google sign-in.
  • [THOR] Universal AI inference control plane — devices + models + pricing + personal pod.
  • [THOR] Expand providers to 27 cloud providers + smart-routing engine.
  • [THOR] Generalize providers — pods now share inference + sandbox + search
    • vision + video + tts/stt + agents.
  • [THOR] /keys — one-click API key page (no pod context).
  • [THOR] /providers/connect — one-click OpenRouter + capability-tabbed catalog + clipboard-detect paste.
  • [THOR] Smart-route wired into gateway + Stripe top-up + OAuth (HF, Cloudflare, Replicate).
  • [THOR] OAuth: GitHub + Google + Vercel + Fly.io (7 providers total).
  • [THOR] Fix: move /providers/supported to public routes.
  • [THOR] Token Vault + in-MCP OAuth passthrough.
  • [THOR] /sandboxes unified web view + 4 MCP tools wrapping agent-runtime.
  • [THOR] Pod-scoped filesystem with vector search (Drive) + universal secret vault.
  • [THOR] Pod-agent-VM + Capsule — always-on pod VM across 9 providers + portable Pod Capsule.
  • [THOR] 4 followups: durable runs, HMAC webhooks, real CLI dispatcher, auto-bucket.
  • [THOR] <slug>.hyperspace.sh wildcard routing + Lambda-style pod URL; full GDrive / Dropbox / Notion connectors; agent templates catalog.
  • [THOR] Runtimes + sessions + user-templates: python/node/docker pod apps + collaborative editing + user-published template marketplace.
  • [THOR] pod-orchestrator — conversational /chat with 27 tools, Grok+GLM model stack, zero Claude dependency.
  • [THOR] Generative-UI + MCP + threads + share: orchestrator emits widgets inline (Stripe, OAuth, confirm, choice, text, markdown) + MCP server + chat history + public shares.
  • [THOR] Complete orchestrator UX: streaming + voice + form + auto-title.
  • [THOR] /observability + /billing hub + 11 new orchestrator tools.
  • [THOR] Guardians + bg-loops + plan-gating — autonomous self-healing + scheduled eval + free-tier gate.
  • [THOR] Mobile + PWA + metered — responsive pass + PWA manifest + Stripe metered overage.
  • [THOR] BYOK + federation + directory — Tier 2.5 BYOK route + Ed25519 federation + public pod directory + OpenClaw/Hermes templates.
  • [THOR] Pre-launch red/yellow fixes cleanup.

Engineering update — 15 Thor · 1 Chain · 11 P2P

v5.17.0v5.17.1v5.17.2v5.17.3v5.17.4v5.17.5v5.18.1v5.18.2v5.18.3v5.18.4v5.18.5v1.4.0
Show full shiplog
  • [P2P] v5.17.0 — hardware-tiered training (fast rounds on every machine).
  • [P2P] v5.17.1 — upload gradients to BOTH ContentStore AND Supabase.
  • [P2P] v5.17.2 — training lifecycle telemetry at every step.
  • [P2P] v5.17.3 — remove coordinator gate (every node trains independently).
  • [P2P] v5.17.4 — granular telemetry for gradient fetch/upload pipeline.
  • [P2P] v5.17.5 — clean distributed-training rewrite + admin-configurable job spec; pods: private compute clusters with distributed inference; persistent ContentStore; P2P distributed database for training (CRDT + ContentStore).
  • [P2P] v5.18.1 — inference-package type errors blocking CI.
  • [P2P] v5.18.2 — llama-rpc-bridge type errors.
  • [P2P] v5.18.3 — training-worker versioned auto-update.
  • [P2P] v5.18.4 — llama-server versioned from core constants.
  • [P2P] v5.18.5 — Nesterov momentum + checkpoint continuity for DiLoCo.
  • [CHAIN] Mysticeti patch stream (pre-v1.4.0 cleanup + post-LIVE hardening):
    • v1.4.1 — auto-recovery from round stalls, priority routing, no-wipe deploys.
    • v1.4.2 — unique per-validator keys + periodic block re-broadcast.
    • v1.4.3 — full block re-broadcast + round-advance diagnostics.
    • v1.4.4 — block sync protocol + get_block FFI.
    • v1.4.5 — bypass ready_new_block leader check — SUSTAINED CONSENSUS.
    • v1.4.6 — permissionless validator joining via stake-weighted committee.
    • v1.4.7 — whitelist polling + stake-weighted committee + safe expansion.
    • v1.4.8 — 1-second sync cycle for continuous block production.
    • v1.4.9 — revert event-driven to 1s sync.
  • [THOR] Open Agents integration — orchestrator + git-auto + model-picker
    • sandbox; API routes + web UI + backend wiring.
  • [THOR] Absorb Open Agents patterns into Thor's managed-agents core.
  • [THOR] Unified Thor session experience — one agent UX to rule them all.
  • [THOR] Close all 10 Open Agents gaps — persistence, durability, reconnect, GitHub App, diff, preferences.
  • [THOR] Expose Thor's 6-provider compute fleet in session creation.
  • [THOR] Polish Thor sessions UI to Open Agents level — Tailwind + Lucide.
  • [THOR] Open Agents-level polish — summary bar, file pills, live timer, thought badges.
  • [THOR] Pod API: join, leave, offline, shard-plan endpoints for hyperspace CLI.
  • [THOR] Delete /api/open-agents — merge into /api/managed natively.
  • [THOR] Restore lost capabilities — sandbox factory + enhanced session create.
  • [THOR] Final 5 UI polish — markdown, per-tool renderers, attachments, OG metadata.
  • [THOR] AI SDK gateway — last gap closed.
  • [THOR] Neurosymbolic v2.1 → v3.9 — decision model, runtime model, convention model, loading model, AVM merge + execution model, Neural Computer bridge (R-NS-129→132), Neural Computer (R-NS-133→138), AVM default-wire bootstrap, harness + memory + search triplet (R-NS-124→126), NC Tier 1-4 (R-NS-139→161) — co-training harness + specialized adapters + high-leverage wiring + production rollout with metrics + training + benchmark.
  • [THOR] a2a-v2 Phases 60–105 — feature guide, UI bulk-select + per-IP rate limit + goal batch export, CLI verbs for new primitives + input validation + bulk-close, UI surfaces, strategic intelligence — explain + suggest + recompute-priorities + schema versioning, agent workload + webhook retries w/ DLQ, audit hash chain + JSON schema export + keyboard shortcuts, GitHub integration — goal.closed → issue/PR comment, DLQ replay endpoint + CLI + Prometheus histograms, Linear integration (GraphQL commentCreate), A2A_V2_COMPLETE.md (Phases 61–73), Informatica-inspired workflow DAG + event-wait + goal params, recovery strategies + agent pre/post hooks, error workflows + join sub-goals + for-each expansion, blueprint serialization + expression language + pinned replay + credentials + template versioning/ impact, failure lessons + Packs + OpenTelemetry tracing, /healthz + validateConfig + shutdown hooks, performance benchmarks, targeted integration tests (resume recovery, credential rotation, template rollback, DLQ replay), security hardening (auth, fuzz, path traversal, credential leak), Docker image + compose stack with OTEL + Jaeger, UI template editor, structured logging with correlation IDs, auto-generated OpenAPI 3.0 at /api/a2a/openapi.json, self-improving templates (Manager proposes mutations from historical runs), MCP server (Claude Desktop / Cursor / Windsurf), MCP client mode (external MCP servers as Contract-Net candidates), Cursor shadow workspace + agentType routing + cost cascade + memory bridge, Ralph executor
    • NC integration.
  • [THOR] Migrate off OpenAI/Anthropic → Grok/Kimi/GLM/Minimax model standardization.

massive parallel feature spree

v5.15.2v5.16.0v5.16.1v5.16.2v5.16.3v5.16.6v5.16.7v5.16.8v5.16.9v1.3.19v1.3.20v1.3.21
Show full shiplog
  • [P2P] v5.15.2 — comprehensive training fixes: seed data + logging + telemetry.
  • [P2P] v5.16.0 — complete DiLoCo pipeline (aggregation + weight distribution).
  • [P2P] v5.16.1 — aggregated weights via P2P ContentStore first, Supabase fallback.
  • [P2P] v5.16.2 — BitTorrent timeout 5 min → 30 s; worker lifecycle telemetry.
  • [P2P] v5.16.3–v5.16.6 — TUI corruption fixes: emitKeypressEvents ordering, remove stderr writes from chain RPC poller, suppress ALL stderr writes that corrupt TUI input, suppress AVM binary-manager stderr writes.
  • [P2P] v5.16.7 / v5.16.8 — macOS install script runs TUI interactively.
  • [P2P] v5.16.9 — time-based round IDs + 6-min health timeout.
  • [CHAIN] Chain v1.3.19 — production hardening: async execution, backpressure, scoring, checkpoints.
  • [CHAIN] Chain v1.3.20 — checkpoint P2P, certified timeouts, stake-weighted scoring.
  • [CHAIN] Chain v1.3.21 — complete certified-timeout + checkpoint- consumer logic.
  • [CHAIN] Chain v1.3.22 — revert async execution (caused 4-way fork).
  • [CHAIN] Chain v1.3.23 — cross-region grace period (wait 500 ms for slow validators).
  • [CHAIN] Chain v1.3.24 — grace period targets QuorumSize+1, not all validators.
  • [CHAIN] Mysticeti integration (chain-v1.4.0) — Sui's consensus kernel via Rust FFI.
    • Full FFI bridge — 12 functions, Core + CommitObserver + BlockStore.
    • Adapter + P2P message code — engine ready for integration.
    • --consensus=mysticeti flag wired in server.go.
    • --mysticeti-ordering flag, shared execution pipeline.
    • Tx ingestion + P2P block exchange + HandleMessage routing.
    • Proper P2P encoding for block broadcast.
    • Genesis broadcast, broadcast fix, period=1.
    • First blocks produced on Mysticeti consensus.
    • v1.4.0 LIVE IN PRODUCTION — 9 blocks/sec, zero stalls.
  • [THOR] Massive parallel spree. The following series all landed in a concentrated burst:
    • Neurosymbolic v0.1 → v1.92 (100+ commits) — from Aho-Corasick pattern analyzer, DAG deadlock detector, plan canonicalizer + policy cache, Zobrist trace hashing, constraint DSL + CNF compiler + SAT gate, bounded model checker, proof-carrying trace (MMR + Ed25519), real UCB1 MCTS with constraint- pruning, RLM↔neurosymbolic fusion bridge, invariant miner, unified capability graph, typed sessions (invariants as types), self-evolving policy loop, DPO synthesizer, top-level orchestrator (v1.0), live RLM-1 hot-path wiring, self- introspection API, ConstraintSet algebra, Prometheus observability export, AVM/zk bridge — tiered proof escalation, counterfactual replay, active- inference gate, distributed constraint consensus via Paxos, UCG query language, LTL constraints + miner + repair, UCG persistence, cross-agent constraint transfer, live HTML dashboard + SSE, compiled CNF cache, wire bridge into THOR-1 [EXECUTE] mode, property-based fuzz, self-explaining decisions, prover plugin system, per-agent bridge isolation, contradiction detection, conformance test suite, per-session policy snapshots, debug REPL, contradiction screening, differential constraint coverage, trace-replay determinism, multi-agent handoff, LLM-as-arbiter on rejected promotions, constraint-set git-diff/merge protocol, chain-of-thought explainer, trajectory clustering, zk-proof witness export, full-stack AVM cartridge facade, cross- language cartridge JSON-RPC, distributed contradiction cache via gossip, constraint-aware prompt guard, compliance audit-log export, CI policy-gate, typed-session linker, SARIF export, reverse-evolver, cartridge-as-MCP-server, npm boundary, differential constraint miner, canonical substrate benchmark, hardware-attested gate, streaming gate, WASM-embeddable bundle, JSON Schema export, declarative YAML/JSON DSL parser, NSaaS HTTP server, Docker manifest, third-party conformance harness, GitHub Action manifest, Python package, WASI Preview 2 component manifest, research-paper replication kit, Kubernetes operator, TLA+ specification + TLC harness, substrate-as-curriculum, Claude skill manifest, single-file CLI binary, self-contained landing-page generator, Homebrew formula, podcast/video episode-script generator, which-module-do-I- need wizard, multi-language SDK matrix, substrate comparison matrix, frozen- reference release builder, Discord/Slack ChatOps scaffolds, source-code-as- documentation, substrate-as-subprocess, module dependency graph, .deb / .rpm emitter, production-readiness checklist, OpenTelemetry instrumentation, incident-response runbook generator, chaos-engineering harness, first-time setup wizard, module deprecation policy, SBOM + master-index (100-module milestone), promotion ladder + RFC scaffolding, CHANGELOG + compat-matrix + license-header.
    • a2a-v2 Phases 2–59 — saga + coalition + approval batcher + real bids + sub-goals, ε-greedy exploration + GoalObserver + auto-decomposition + peer- review + recover-on-boot, goal dependency graph + Judge tiebreak + review- loop closure, reputation decay + envelope dry-run + saga-backed sub-goal sequencing, AgentBase dry-run gate + Manager convergence escalation, reputation-weighted Contract-Net bidding, auto-coalition fallback + budget reallocation, dependent wake-up + peer-review in main _tick + rich status rollup, dependent auto-wake + taskType inference + NL goal detection, goal templates + cost prediction + agent retirement floor, blocker escalation via Beacon + chain graph + Nova dry-run preview, skill-gap signal + Manager digest + Bob dry-run preview, pattern miner + agent concurrency cap + Arch dry-run, Smith gap-queue + goal auto-summary + Contract-Net cost ceiling, discovered templates + handoff sanitization + goal deadlines, dep-cycle guard + auto-promote patterns + goal priority, similar-goal retrieval + Manager prior-goal lineage + Sleuth dry-run preview, goal archival + trajectory replay + Vulcan deploy preview, Manager CLI verbs (digest, patterns, templates, similar, estimate, replay, archive), barrel export, end-to-end integration test, architecture guide, cross-goal context carryover + goal tags + periodic digest, goal clone + portable export/import blobs, bid refusal + goal merge, per-goal tick lock + agent heartbeat, stale- agent report + idle-goal eviction, evict/stale/note/cancel CLI verbs, kickoff convenience + operator notes, unified health verb + per-user usage rollup, per-user rate limit, bulk tickAll + tag filter, cross-process goal lock + read-only snapshot, Manager doctor — comprehensive stack diagnostic, periodic digest with doctor warnings, goal watchers — stakeholder notifications beyond owner, tick progressPct + full snapshot for live-tail, goal full-text search + markdown export, cross-goal activity feed, Mermaid dep graph, thor-spawn → Manager integration test, HTTP API routes + backend mount, UI dashboard + Smith drain daemon + subsystem triggers, architecture doc refresh, UI Mermaid live-render + Prometheus /metrics + background ticker, Slack webhook digest + reusable goal-intent UI hook, per-goal SSE stream + JSON stats + UI live subscription, Discord webhook + dedicated thor-a2a CLI + free-text UI kickoff, UI action menu + SLA time-to-close + audit JSONL, /audit endpoint + UI decision trail + watch button, HMAC webhook signing + fleet-wide Mermaid + Judge history, UI tiebreaks panel + tag filter + priority slider, comprehensive end-to-end wiring test.
    • hyperspace-os v3.31 → v3.54 — 20+ releases adding dozens of classical algorithms (DWT + DSP filters, Hamming codes, 2-SAT + Van Emde Boas, LCA binary lifting + HLD, Mo's + bit manipulation, sparse table + mergeable heaps, Ukkonen suffix tree, Cartesian tree + Hungarian, MCMF + Bellman-Ford/SPFA/Johnson, rotating calipers + rollback union-find, centroid decomposition, XOR trie + Stern-Brocot/Farey, Link-Cut Tree + BWT/FM-index, Li Chao tree + graph coloring, Bezier curves + marching squares, Hough transform + Catmull-Rom splines, SOS DP + Chebyshev polynomials, Prüfer sequences, Gale-Shapley + L-BFGS, Bron-Kerbosch + Welzl MEC, VP-tree + transitive closure, Held-Karp TSP, Karger min-cut + tree isomorphism, Chu-Liu arborescence + Karp MMC). Final: 2,410 tools / 335 modules. Matrix-2 tool filter + kernel telemetry + manifest.
    • Agent fleet migration — Cartographer (live delegation graph + ops summary), Themis + Rail + Beacon + Smith coordination, auto-remediation flywheel (Heimdall → Rail → Valkyrie + Siren), envoy + veil + gatekeeper + odin-mlp + sage-lsh (API proxy + privacy + vault + non-linear policy + LSH), migrate-Aura → AgentBase (12 legacy migrations), 38 new agents past the 100-agent target (111 total). AgentBase v1.0 + 41 new agents + 6 legacy migrations + CLI. Real model routing for Hermes/Dolphin/Pplx.
    • Real OSS CLI wrappers ("wrap-don't-reimplement") + Hyperspace broker for closed-source framework access.
    • callLLM shared helper + watch + autotrain flywheel closure.
    • Batched-ledger + SSE rail stream.
    • Constable-gated delegate + architecture doc.
    • Delegate (agent-to-agent handoff) + creative batch (5 new + 2 migrated).
    • Rail (agent-to-agent bus) + Lift (migrator) + Themis (compliance scanner).
    • Ref (dispute resolver) + Smith guard chain (auto-certification).
    • Dashboard + sessions + bard + navigator + notary (observability + persistence).
    • Ink v1.0 — embedded doc editor + surfaces adapter (Claude-for-Word-class).

Engineering update — 13 Thor · 5 Chain · 19 P2P

v5.10.2v5.10.3v5.10.4v5.10.5v5.10.6v5.11.0v5.11.1v5.12.0v5.12.1v5.13.0v5.13.1v5.13.2
Show full shiplog
  • [P2P] v5.10.2 — default CLI ports 4001/4002 + bootstrap redeploy workflow.
  • [P2P] v5.10.3 — directly POST /start-round to training worker.
  • [P2P] v5.10.4 — GPU device detection + requests dep for training worker.
  • [P2P] v5.10.5 — training-worker script deployment (correct file from tarball).
  • [P2P] v5.10.6 — fire-and-forget /run-inner-loop POST.
  • [P2P] v5.11.0 — real distributed training: gradient exchange across P2P network.
  • [P2P] v5.11.1 — gradient-collection timeout + lightweight GossipSub announcements.
  • [P2P] v5.12.0 — train on local experiment data (not synthetic DPO).
  • [P2P] v5.12.1 — clear activeRoundId after training; cooldown → 10 min.
  • [P2P] v5.13.0 — Supabase Storage as gradient relay for real multi-node training.
  • [P2P] v5.13.1 — training sidecar — pre-built Python environment.
  • [P2P] v5.13.2 — chunked sidecar download from Supabase Storage.
  • [P2P] v5.13.3 — macOS ARM64 training sidecar + CI build workflow.
  • [P2P] v5.14.0 — BitTorrent (WebTorrent) for P2P sidecar + model distribution.
  • [P2P] v5.14.1 — hardcoded sidecar magnet URI (no node dependency).
  • [P2P] v5.14.2–v5.14.5 — webtorrent packaging fixes.
  • [P2P] v5.14.6 — enable training on ALL nodes.
  • [P2P] v5.15.0 — training init no longer gated behind FederatedTrainingService.
  • [P2P] v5.15.1 — lower AUTO_TRAIN_MIN_VRAM_GB 8 → 4.
  • [CHAIN] Chain v1.3.15 — consensus-aware auto-updater (staggered health-gated restarts).
  • [CHAIN] Chain v1.3.16 — Bullshark liveness (unilateral wave skip after 40+ missed rounds).
  • [CHAIN] Chain v1.3.17 — Narwhal channel-deadlock + sync stale-chain false-positive.
  • [CHAIN] Critical validator address-derivation bug (SHA256 → proper ECDSA Keccak256); allow fix-addresses through auth middleware.
  • [CHAIN] Chain v1.3.18 — RLP commit-decision broadcast int64 → uint64.
  • [THOR] GBrain-inspired vault & memory system overhaul.
  • [THOR] HYPERSPACE_AGENTIC_OS.md + 41 kernel tests — 273/273 passing.
  • [THOR] Managed agents: AVM logging, kernel-init gate, outcome→memory, TF-IDF search.
  • [THOR] Comprehensive Hyperspace Agentic OS & Thor Agent documentation.
  • [THOR] Hyperspace ↔ Thor end-to-end integration — 5 cross-system bridges.
  • [THOR] 3 new OS kernel primitives — inference gateway, scheduler, agent pub/sub.
  • [THOR] GossipSub-compatible agent mesh + multimodal inference (vision, pipes, MLX).
  • [THOR] Hyperspace OS hardening — AVM bypass fix, kernel-init race, outcome→memory, new kernel modules.
  • [THOR] Security: fix 6 CRITICAL/HIGH vulnerabilities from audit; second sweep for remaining.
  • [THOR] Neurosymbolic Gate — 6 symbolic decision layers over neural outputs.
  • [THOR] Latent Briefing-inspired optimizations — progressive tools, pipe compaction, history compaction.
  • [THOR] vLLM/Ollama integration — prefix caching, adaptive routing, local- first inference.
  • [THOR] Wire neurosymbolic components end-to-end — no more scaffolding.
comparing Hyperspace A1 chain to [Ethereum, Solana, Tempo, Lightning]

this is the most advanced design on the planet for making agent to ag
2.1Kviews9bookmarks15likes@varun_mathur ↗
Agentic PaymentsBlockchain
[, ]

hyperspace cli is the densest mashup of every p2p core tech you can think of, applied for agents -> building towards network intellige
6.1Kviews38bookmarks45likes@varun_mathur ↗
AgentRankGossip Protocol
it's cooking in testnet currently. 

-> permissionless, anybody can join
-> nearly free agent to agent micropayments at scale
-> the chain c
11Kviews19bookmarks29likes@varun_mathur ↗
Agentic PaymentsBlockchain
Hyperspace is training a research model on the peer-to-peer network, using the autoresearch experiments also done across the network

We poi
18Kviews117bookmarks107likes@varun_mathur ↗
AutoresearchAstrophysicsGossip Protocol

Engineering update — 20 Thor · 8 Chain · 10 P2P

v5.7.1v1.3.11v5.8.0v5.8.1v1.3.13v5.8.2v5.8.3v5.8.4v5.9.0v5.9.1v5.9.2v5.10.0
Show full shiplog
  • [P2P] v5.7.1 — chain binary v1.3.11 (commit-decision gossip).
  • [P2P] v5.8.0 — hyperspace train: distributed LoRA fine-tuning on experiment data.
  • [P2P] v5.8.1 — chain v1.3.13 (stale-chain auto-wipe + exit(1) fix).
  • [P2P] v5.8.2 — auto-training starts when 3+ GPU peers online.
  • [P2P] v5.8.3 — P2P training-data sharing (every node gets experiment data from all peers).
  • [P2P] v5.8.4 — commit missing substrate.ts (CI break since v5.8.0).
  • [P2P] v5.9.0 — solo-training mode + CPU-QLoRA path.
  • [P2P] v5.9.1 / v5.9.2 — training-init __dirname fix (subpath export + ESM polyfill).
  • [P2P] v5.10.0 — autonomous training worker (auto-install deps, spawn Python sidecar).
  • [P2P] v5.10.1 — ESM __dirname + stale-script detection + log visibility.
  • [CHAIN] Chain v1.3.8 — strict round-quorum, no emergency 0-cert advancement.
  • [CHAIN] Chain v1.3.9 — BlockSTM WaitGroup race + sync-before-consensus on startup.
  • [CHAIN] Chain v1.3.10 — WaitForSync settle window.
  • [CHAIN] Chain v1.3.11 — commit-decision gossip (steady-state fork fix).
  • [CHAIN] Chain v1.3.12 — stale-chain auto-recovery (external-node self- healing).
  • [CHAIN] Chain v1.3.13 — stale-chain recovery exit code.
  • [CHAIN] Chain v1.3.14 — full block explorer: payment channels, consensus health, Blockscout-style blocks+tx pages, tx generator that funds agents + sends value transfers to 100+ real agent addresses.
  • [CHAIN] Homepage restructure 13 → 10 sections + minimal nav; architecture moved to /architecture (v2 → v3 diagram).
  • [THOR] Hermes parity + Ultron merge — full computer use, autonomous daemon, ecosystem discovery.
  • [THOR] Wire full Thor ecosystem into managed sessions — 16 new tools.
  • [THOR] Active Inference + DAEDALUS + Plugins + Bifrost — 232/232 tests.
  • [THOR] Make every Thor session a managed-agent session by default.
  • [THOR] Persistent agent identity — memory consolidation across sessions.
  • [THOR] Wire AVM sandbox as container tier + execution-proof capture.
  • [THOR] AVM as Agent Virtual Machine — every execution traced + proven.
  • [THOR] Wire avmd daemon as session supervisor.
  • [THOR] AVM inline security gate + WebSocket bridge + dynamic model switching.
  • [THOR] 43-item parity — OpenClaw modules + Hermes security/MCP/providers + Thor internals.
  • [THOR] Channel platform features — Telegram webhook, Discord controls, Signal media.
  • [THOR] Final 18 items — Tailscale, Gmail, DM pairing, Grok caching, SBOM, MCP gen, logs, diffs.
  • [THOR] Final 8 — Vercel/Copilot/Gemini providers, model picker, Matrix receipts, Singularity, seccomp.
  • [THOR] Hyperspace Kernel — GPU, resources, model manager, power modes, consciousness.
  • [THOR] Coexistence layer — detect and integrate Hermes, OpenClaw, Claude Code, Aider, Cursor.
  • [THOR] Shared Memory Bus + Universal Task Router — the OS kernel services.
  • [THOR] Thor Companion macOS app (Clicky fork) + keep-alive agents + voice prompts.
  • [THOR] OS Intercept Layer — every framework interaction flows through Hyperspace.
  • [THOR] Credential Gateway — Hyperspace as the API key manager for ALL frameworks; wired to actual UI API key storage (user_provider_keys).
  • [THOR] Close ALL honesty gaps — migrations, persistence, search, pipes, handoff.

Engineering update — 10 Chain · 3 P2P

v1.3.1v1.3.3v1.3.4v1.3.5v1.3.6v1.3.7
Show full shiplog
  • [P2P] hyperspace doctor + hyperspace logs commands — Hermes gap closure.
  • [P2P] Thor feature list + competitive analysis (Hermes + OpenClaw).
  • [P2P] Hyperspace explorer + faucet + MetaMask button components.
  • [CHAIN] Chain v1.3.1 — determinism fixes for 4-way chain fork.
  • [CHAIN] Chain v1.3.3 — DAG-based view change + deterministic gas limit.
  • [CHAIN] Chain v1.3.4 — auto-updater downgrade protection + bootnode sync fix.
  • [CHAIN] Chain v1.3.5 — deterministic epoch-boundary gas limit.
  • [CHAIN] Chain v1.3.6 — remove isCatchingUp wave skipping.
  • [CHAIN] Native TypeScript (@hyperspace/sdk) and Python (hyperspace) SDKs.
  • [CHAIN] Typed RPC errors, hyperspace devnet, hyperspace status.
  • [CHAIN] Contracts: SkillRegistry + TaskEscrow2 + ReputationOracle examples.
  • [CHAIN] Chain v1.3.7 — Docker image, monitoring stack, testnet faucet, developer docs.
  • [CHAIN] Website deep-dive refresh: /architecture, /developers, /research, /thor, /tokenomics, /payments, /desktop, /metal, /network, homepage overhaul (11 sections), new top nav + sidebar IA, API /network-stats extended with economy, uptime, targets.
How to think about the Agentic OS

8:10 - From early experiments to an entirely new OS
12:51 - Early bet on spatial UI and what it taught us
19Kviews186bookmarks112likes@varun_mathur ↗
Agentic OSAgentic PaymentsSpatial UI

Engineering update — 2 Chain · 1 P2P

v5.7.0v1.3.0
  • [P2P] v5.7.0 — cut-over to chain-v1.3.0 era. Intelligence Flywheel OG image, payment-stats update (3,300 payments through 500 channels), live RPC stats + animated routing & flywheel diagrams, graceful HTTPS fallback + refresh button, 3 diagrams (stake-secured DHT, channel lifecycle, payment mesh), rename /stateless-report → /agentic-micropayments, economics + PoI sections.
  • [CHAIN] Chain v1.3.0 — Tempo-inspired payment UX + end-to-end wiring.
  • [CHAIN] Channel persistence + multi-channel per sender.

Engineering update — 2 Chain · 4 P2P

  • [P2P] Feat: add stateless execution report at /stateless-report.
  • [P2P] Rewrite stateless report — accurate to hyperpaper architecture.
  • [P2P] Rewrite blog post — 695 agents, streaming channels, real economy.
  • [P2P] Add Tempo vs Hyperspace deep-dive comparison table; OG social card; 10M TPS reference.
  • [CHAIN] Wire hspace_pay RPC to streaming payment channels (hyperpaper § II.A).
  • [CHAIN] 6 Tempo-inspired payment UX improvements.

Engineering update — 3 Chain · 1 P2P

v1.2.0
  • [P2P] Bump EDGE_BINARY_VERSION to chain-v1.2.0.
  • [CHAIN] Chain v1.2.0 — stateless execution pipeline (hyperpaper § V).
  • [CHAIN] Wire hspace_sendProofCarryingTransaction RPC + EVM fallback.
  • [CHAIN] Wire PCT submitter to nanochains — full stateless path active.

Engineering update — 13 Thor

Show full shiplog
  • [THOR] Fully local Ironman/Jarvis + custom-model GGUF packaging + E2E tests.
  • [THOR] All 18 Jarvis actions run locally — zero backend dependency.
  • [THOR] 18/18 Jarvis actions local + Matrix-2 local server for MacBook.
  • [THOR] Local-agent-store — all agents, skills, MCP servers offline.
  • [THOR] Correct agent dedup — 2,142 unique agents (was 3,137 with duplicates).
  • [THOR] Docker image + one-command install script.
  • [THOR] Thor single-binary build — 40 MB JS bundle + native sidecar.
  • [THOR] GitHub Actions release pipeline for Thor binary.
  • [THOR] Add missing data files + fix release workflow.
  • [THOR] esbuild packaging sweep — track ~1,222 JS/JSON in thor-services + agents-complete + workflow-engine + sandbox + wolf-of-wall-street / superagent / ios / cron / avm / etc.
  • [THOR] Drop macos-13 x64 runner, ARM64 via Rosetta 2.
  • [THOR] lancedb + kuzu deps added to CLI, bump better-sqlite3, Matrix-2 fixes.
  • [THOR] Add Qwen3-Coder + MiniMax M2.7 models; upgrade GLM-5 → Turbo.
March 202673 entries
March 2026 Aggregate Stats Per Grok
Campaign aggregate views and bookmarks across Perplexity, OpenAI, HyperspaceAI, Manus, Anthropic, OpenClaw, YC W26 Startups, Nous Research — March 2026.

Per Grok: aggregated from X data across the biggest AI product launches in March 2026 — total views (reach) and total bookmarks (intent / saves).

Methodology

  • HyperspaceAI — every post + every reply by @varun_mathur in March 2026 (full account activity, no keyword filter). Collected via from:varun_mathur since:2026-03-01 until:2026-04-01. Sum of the 10 high-engagement launches plus hundreds of smaller threads and replies → 5.6M views · 29.0K bookmarks.
  • Everyone else (Perplexity, OpenAI, Manus, Anthropic, OpenClaw, YC W26 Startups, Nous Research) — main launch announcement + up to 3 follow-up threads per campaign. X advanced search on each official account with relevant launch keywords + date range.

Takeaways

  • Perplexity* leads on both views (11.2M) and bookmarks (35.0K), but had at least one paid partnership in their launch — others unknown.
  • HyperspaceAI ties OpenAI on views (5.6M) and comes in #2 on bookmarks (29.0K), ahead of every other AI lab on intent — from a single-person campaign.
  • Intent-per-view ratio for HyperspaceAI is ~0.52% vs OpenAI's ~0.09% — ~6× stronger save rate per impression.

Ties on views are broken by bookmark count, which is why HyperspaceAI lands above OpenAI on the first chart.

Engineering update — 8 Thor

  • [THOR] Thor vs Claude Code gap analysis — 10 gaps, 760 L to fix P0-P1.
  • [THOR] Claude Code parity — LSP, file dedup, result storage, bash safety, micro-compaction.
  • [THOR] Deep parity — Group A foundations.
  • [THOR] Groups B, C, D — 13/13 gaps closed.
  • [THOR] File undo, plan mode, notebook editing.
  • [THOR] Plug all 11 implementation gaps in Claude Code parity.
  • [THOR] Thor in a Box — full Thor runs locally without Supabase.
  • [THOR] Thor complete reference — architecture, index, plans, session changes.

Engineering update — 10 Thor · 3 Chain · 1 P2P

v1.1.0
Show full shiplog
  • [P2P] Bump EDGE_BINARY_VERSION to chain-v1.1.0.
  • [CHAIN] Chain v1.1.0 — stateless validator memory (hyperpaper § V).
  • [CHAIN] Catch-up mode drains commit backlog without creating empty blocks.
  • [CHAIN] 60 s timeout on handleCommitDecision prevents permanent stall.
  • [THOR] Hyperspace product plan — cloud, Docker local, native local, converged.
  • [THOR] Full browser automation in Metal — ported from @agenticos/browser-service.
  • [THOR] Complete Metal wiring — CLI integration, tsc clean, integration tested.
  • [THOR] Hyperspace Metal — all 12 modules complete (7,849 lines).
  • [THOR] Metal Module 4 — MetalMemory (unified local memory).
  • [THOR] Metal Module 1 — MetalStore (SQLite + FTS5).
  • [THOR] Default local model → qwen3.5-27b (not 235b).
  • [THOR] Local-first agent mode — hyperspace chat --local.
  • [THOR] Self-improving agent — memory_nudge, skill_write, rune_forge tools.
  • [THOR] Galileo → Qwen3-235B-A22B (reconfirmed).

Engineering update — 1 Chain · 3 P2P

  • [P2P] Update research report to March 2026 — 660 agents, 5 domains, 101K blocks.
  • [P2P] March 2026 network intelligence report at /network-report; remove "sovereign L1 blockchain" phrasing.
  • [P2P] Stub @hyperspace/proof-of-intelligence in Vite build.
  • [CHAIN] March 2026 research intelligence report (660 agents, 5 domains, 101K blocks).

Engineering update — 11 Thor

Show full shiplog
  • [THOR] Phase 1 gaps — lifecycle hooks, OpenAI API, Matrix, voice transcription.
  • [THOR] Phase 1–2 gaps — DingTalk, HA chat, ContextEngine, backend wiring.
  • [THOR] HyperAgents integration — MetaAgent, batch trajectories, backend wiring.
  • [THOR] Complete all 22 gaps + 5 HyperAgents integrations.
  • [THOR] Register all 24 channels — surpass OpenClaw's channel count.
  • [THOR] CLI gaps — sessions browser, cost tracker, queue viewer, themes, PTT voice.
  • [THOR] Migration tools for OpenClaw and Hermes Agent users.
  • [THOR] Honest feature-comparison chart: Thor vs OpenClaw vs Hermes.
  • [THOR] galileo.hyper.space — standalone deep-research demo.
  • [THOR] Galileo with real web research — Serper + Exa search pipeline.
  • [THOR] Galileo → Qwen3-235B-A22B (100× cheaper than Gemini).
Hyperspace agentic blockchain is the first "A1" of it's kind. Core features: 
- Designed for high volume of agent-to-agent micropayments as
5.3Kviews13bookmarks28likes@varun_mathur ↗
Agentic PaymentsBlockchain

Stateless Execution v1.0.0

v5.4.0v1.0.0v5.5.0v5.5.1
Show full shiplog
  • [P2P] v5.4.0 — bump chain binary to v1.0.0 (stateless execution, hyperpaper compliance).
  • [P2P] v5.5.0 — TurboQuant: 3-bit KV cache + 7.7× vector compression.
  • [P2P] v5.5.1 — complete TurboQuant: KV block manager, quantizer, gossip, index.
  • [CHAIN] Chain v1.0.0 — Stateless Execution (Hyperpaper Full Compliance).
    • Stateless execution — hyperpaper Path B (3 phases, 11 specs).
    • Wire full nanochain engine into consensus + CGO build + EnableDA.
    • Nanochain engine infrastructure from server.go.
    • Critical double gas-deduction fix in nanochain EVM execution.
    • Critical FFI return-code bug + remove all P2P handler stubs.
    • E2E hyperpaper integration tests + PCT RPC + nanochain engines.
  • [CHAIN] Disconnect peers with wrong genesis immediately (Ethereum pattern) → reverted same day (let them auto-update via HTTPS).
  • [CHAIN] rpc.a1.hyper.space DNS → validator (full-state RPC endpoint).
  • [THOR] TurboQuant — data-oblivious vector quantization for KV cache + vector search.
  • [THOR] autoweb.hyper.space — 3-agent evolutionary webapp builder.
Summary of Hyperspace releases:
- CLI at v5.4.0 -> peer-to-peer collaboration between autonomous agents [gossip swarms of autoresearchers an
—views11bookmarks21likes@varun_mathur ↗
AutoresearchBlockchain

Engineering update — 8 Chain · 6 P2P

v5.3.7v5.3.8v5.3.9v0.2.10-alphav5.3.10v0.1.1v0.2.11-alphav0.2.12-alphav0.2.13-alphav0.2.0
Show full shiplog
  • [P2P] v5.3.7 — chain RPC polling in v1 TUI (live block height + visualization).
  • [P2P] v5.3.8 — add chain-poll debug logging to stderr.
  • [P2P] v5.3.9 — chain binary v0.2.10-alpha (tx-body persistence).
  • [P2P] v5.3.10 — avmd v0.1.1 (TLS + log-once fix).
  • [P2P] Show real tx counts in TUI chain visualization.
  • [P2P] Auto-update picks highest version, not first API result; releases API sorts descending.
  • [CHAIN] Chain v0.2.10-alpha — persist tx bodies in LevelDB.
  • [CHAIN] Chain v0.2.11-alpha — fix restart loop for real.
  • [CHAIN] Chain v0.2.12-alpha — transaction gossip.
  • [CHAIN] Chain v0.2.13-alpha — Phase 1.3 fullnode execution.
  • [CHAIN] avmd v0.2.0 — supply-chain protection release (sandboxed installs, integrity checks, behavioral scan).
  • [CHAIN] Live agent-economy feed on /developers.
  • [CHAIN] Agent-to-agent experiment adoption payments — live on testnet.
  • [CHAIN] Agent-payments state snapshot: 20 cycles, 162 payments confirmed.
The V8 analogy is spot on. We've spent too long treating agent execution as a side effect of a web app rather than its own primitive. A spec
3.7Kviews2bookmarks5likes@LeoTava8 ↗
community
Very cool stuff. I imagine in the long run  we’ll have systems where AI drives microcode on general purpose compute, completely bypassing OS
3.2Kviews9bookmarks14likes@samcoward ↗
community
This is the abstraction the agent ecosystem has been missing.

Every framework building its own security model is like every app building it
2.2Kviews3bookmarks2likes@emadgnia ↗
community

AVM day

v5.2.5v0.2.3-alphav5.2.6v5.2.7v5.2.8v5.2.9v0.2.5-alphav5.3.0v5.3.1v0.2.7-alphav5.3.2v0.2.8-alpha
Show full shiplog
  • [P2P] v5.2.5 — chain binary v0.2.3-alpha (RUNPATH + error-flood fix).
  • [P2P] v5.2.6 — ASCII block-chain visualization in TUI.
  • [P2P] v5.2.7 — block-chain row handles undefined chainBlock.
  • [P2P] v5.2.8 — reset crash counter on chain binary upgrade.
  • [P2P] v5.2.9 — chain binary v0.2.5-alpha (full P2P sync).
  • [P2P] v5.3.0 — AVM (Agent Virtual Machine): security, privacy, and resource management for all agents.
  • [P2P] v5.3.1 — chain v0.2.7-alpha (stop 5-min restart loop).
  • [P2P] v5.3.2 — chain v0.2.8-alpha (fix nil panic on old genesis).
  • [P2P] v5.3.3 — ensure avmd sidecar downloaded on every CLI launch.
  • [P2P] Synchronous avmd download on first CLI launch.
  • [P2P] avmd sidecar download via existing auto-update system.
  • [P2P] avm audit uses avm.config.
  • [CHAIN] Chain v0.2.3-alpha — RUNPATH + error-flood fix.
  • [CHAIN] Chain v0.2.4-alpha — verified CDN.
  • [CHAIN] Chain v0.2.5-alpha — full P2P sync.
  • [CHAIN] Chain v0.2.6-alpha — stale genesis auto-fix.
  • [CHAIN] Chain v0.2.7-alpha — stop 5-min restart loop.
  • [CHAIN] Chain v0.2.8-alpha — fix nil panic on old genesis.
  • [CHAIN] Chain v0.2.9-alpha.
  • [CHAIN] Bidirectional StatusMsg handshake (Ethereum devp2p pattern).
  • [CHAIN] Fast chain sync: 1000 blocks/batch, 3 s timeout.
  • [CHAIN] Auto-detect stale genesis; fall back to embedded when no validators.
  • [CHAIN] Chain data persists across binary upgrades (Ethereum-style).
  • [CHAIN] Auto-updater restarted every 5 min (version-comparison bug) — fixed.
  • [CHAIN] avmd daemon — "the agent operating system." Multi-platform release workflow; dropped Windows (Unix sockets unsupported); macOS compat (RLIMIT_NPROC Linux-only).
  • [CHAIN] avmd auto-update — checks GitHub every 5 min, self-restarts.
  • [CHAIN] rustls-tls for reqwest (auto-update HTTPS on macOS).
  • [CHAIN] rpc.hyper.space added to middleware (no password gate).
  • [CHAIN] Release-process docs: CDN, RUNPATH, bootnode order, keys.
  • [CHAIN] Disable cache on network-stats API (Vercel serving 13hr stale).
  • [CHAIN] Recompute block hash after RLP deserialization during sync.
three new models launched so far:

- Matrix: finds right [tools, skills, agents] for a task based on a 100,000+ index

http://
matrix.hyper.
3.2Kviews51bookmarks42likes@varun_mathur ↗
MatrixArchitectProgrammer

Engineering update — 23 Chain · 19 P2P

v5.0.5v5.0.6v5.0.7v5.0.8v5.0.9v5.1.0v5.1.1v5.1.2v5.1.3v5.1.4v5.1.5v5.1.6
Show full shiplog
  • [P2P] v5.0.5 — bypass 10K stake for paid validator subscribers.
  • [P2P] v5.0.6 — validator key file bypasses Supabase stake check.
  • [P2P] v5.0.7 — genesis file fix (public URL + embedded fallback).
  • [P2P] v5.0.8 — chain binary starts immediately after node start (not after 3K lines of agent setup).
  • [P2P] v5.0.9 — gossip chain role in capability announcements.
  • [P2P] v5.1.0 — auto-replace stale genesis on startup.
  • [P2P] v5.1.1 — log chain binary startup/errors to stdout.
  • [P2P] v5.1.2 — duplicate imports + prometheusState scoping fix.
  • [P2P] v5.1.3 / v5.1.4 — lockfile / @libp2p/crypto pin to ^5.1.2.
  • [P2P] v5.1.5 — chain startup logs to stderr (bypass TUI capture).
  • [P2P] v5.1.6 — chain binary starts independently before P2P node; miner IPs in default bootnodes; TUI polls miner RPC when local shows block 0.
  • [P2P] v5.1.7 — Linux chain binary downloads .tar.gz bundle with shared libraries.
  • [P2P] v5.1.8 — bump chain binary to v0.2.2-alpha.
  • [P2P] v5.1.9 — disable chain binary --auto-update (caused restart loop).
  • [P2P] v5.2.0 — re-enable chain binary --auto-update.
  • [P2P] v5.2.1–v5.2.4 — exponential-backoff restart (max 3 attempts).
  • [P2P] Add release script — prevents version mismatch and CI trigger issues.
  • [P2P] Blockchain-node FAQ — roles, troubleshooting, requirements, glossary.
  • [P2P] Remove password gate from proofofintelligence.hyper.space — public launch.
  • [CHAIN] Chain v0.2.2-alpha — Hydra-routed block propagation + P2P sync fix (hyperpaper § III).
  • [CHAIN] Embed genesis JSON in binary (zero-config startup).
  • [CHAIN] Auto-update interval 30 min → 5 min for testnet.
  • [CHAIN] Auto-update URL → public agi repo.
  • [CHAIN] Robust P2P chain sync — bootnodes sync from 0 to head.
  • [CHAIN] Chain sync protocol + new genesis with unique validator keys.
  • [CHAIN] Atomic binary replacement in auto-updater (no .old crash).
  • [CHAIN] net_peerCount RPC — independently verifiable network size.
  • [CHAIN] Developers page (EVM-compatible RPC docs).
  • [CHAIN] Live network stats on developers page; relax consensus health threshold (500-block spread, not 50).
  • [CHAIN] Leaderboard — remove airdrop/5%/alloc column; add experimental disclaimer.
  • [CHAIN] Remove all user-facing "Airdrop" text — replaced with Leaderboard / Genesis weight.
  • [CHAIN] FAQ — headless/no-TUI mode (pipe, nohup, tmux, head).
  • [CHAIN] FAQ — running binary directly without CLI (init + manual flags).
  • [CHAIN] 3-gate validator admission spec (economic + experiment + gossip).
  • [CHAIN] Fix binary RUNPATH ($ORIGIN/lib).
  • [CHAIN] Silently drop unknown consensus messages on fullnodes.
  • [CHAIN] Handle RPC error responses in network-stats API.
  • [CHAIN] MinExperiments=0 validation bug fix.
  • [CHAIN] Rename "Validator" → "Miner" throughout dashboard.
  • [CHAIN] Clean copy-paste run commands on validator dashboard.
  • [CHAIN] Remove genesis allocation section; remove $100/month price mentions.
  • [CHAIN] Strip main-site nav/footer on miners.hyper.space.

Blockchain Integration day

v5.0.0v5.0.1v5.0.2v5.0.3v5.0.4
Show full shiplog
  • [P2P] v5.0.0 — Blockchain Integration. ChainStatusService + TUI panels (chain, PoI/HSCP, agent type, woppals). Hero shows all chain roles. Full validator onboarding flow on PoI website. PoI paper PDF + preview + download link.
  • [P2P] Rename validator → miner across ChainRole and CLI.
  • [P2P] Update EdgeBinaryManager for hyperspace-agentic-blockchain binary.
  • [P2P] v5.0.1 — protocol package needs same node: resolution fix as pay.
  • [P2P] v5.0.2 — TUI blockchain panels, agent run command, version sync fix.
  • [P2P] v5.0.3 — blockchain binary from public hyperspaceai/agi repo.
  • [P2P] v5.0.4 — blockchain binary auto-downloads on every start, default relay role.
  • [P2P] Blackboard-chalk diagrams for The Loop (circular cycle) and ResearchDAG (Git-like graph); hand-crafted SVG diagrams replacing Mermaid ELK layout.
  • [P2P] Animated hero diagram — progressive reveal of intelligence→chain flow.
  • [P2P] PoI is universal — every agent type must prove experiments; rename all node types to agents.
  • [P2P] Woppal economy section — adoption-based rewards; woppal coin logo (chalk W with two teal strikes).
  • [P2P] Adoption chain as hero diagram, restructured page flow; The Loop, Automated Intelligence Economy, Security.
  • [P2P] Honest Bitcoin vs Woppals comparison.
  • [CHAIN] validator signup — Google Auth, Stripe $100/mo, node type tracking, genesis allocation.
  • [CHAIN] Woppal economy v1 → v2 (adoption-based rewards, 1:1 points conversion) → v3 (fixed-budget, anti-collusion, Bitcoin-sound).
  • [CHAIN] Point validator auth + data to p2pnetwork Supabase (dhsvcihyxuxijaookakj).
  • [CHAIN] Subscription-gated consensus — whitelist-based admission; --whitelist-url / --whitelist-key flags; restore server command.
  • [CHAIN] CLI blockchain-sidecar plan documented.
  • [CHAIN] Validator signup architecture — full wiring guide.
  • [CHAIN] miners.hyper.space bypass + root redirect to /validators.
  • [CHAIN] Validators page restyled to design system; onboarding diagram.
  • [CHAIN] Simplify validators page — sign up with Google above fold, chalk diagram.
  • [CHAIN] Stripe SDK — use fetch client + 30 s timeout for Vercel serverless; auto-delete stale pending subscriptions.

Engineering update — 3 Thor · 1 Chain

v0.2.0-alpha
  • [CHAIN] Hyperspace Agentic Blockchain v0.2.0-alpha — validator infrastructure + VaaS.
  • [THOR] Landing page + model stack docs + data-isolation spec.
  • [THOR] Onboarding wizard — deploy step, model config, encryption, review fixes.
  • [THOR] Session review — 12 fixes, Supabase migrations, progress persistence.
Evolutionary jump: Karpathy loop -> Agent World Model

tl;dr: introducing prometheus, a million lines of cognitive engine code running on yo
19Kviews427bookmarks306likes@varun_mathur ↗
PrometheusAutoresearchAstrophysics

Engineering update — 2 Thor

  • [THOR] BYOG workspace provisioning — Hetzner Cloud + Fly.io integration.
  • [THOR] Pricing page + workspace provisioning API + Stripe→VM wiring.

Engineering update — 4 Thor

  • [THOR] Per-user AI workspace image — Thor + ttyd + Gitea + JupyterLab.
  • [THOR] Workspace reverse proxy + service routing fixes.
  • [THOR] Workspace v6 — CLI bundle, proxy routing fixes, full E2E deployment.
  • [THOR] Workspace v8 — full CLI bundle, Thor healthy, all services live.
your rate of shipping is just mad impressive
2.1Kviews—bookmarks1likes@wwwjim ↗
community

Engineering update — 4 Thor

  • [THOR] Commit all in-progress work — Fly.io deploy, backend fixes, CI workflows, CLI commands.
  • [THOR] Thor deploy stabilization — disable crawlers, fix orchestrationBridge, add crawler machine. Dockerfile.crawler needs python3/make/g++ for node-pty.
  • [THOR] Active Inference full stack — Friston FEP across PROMETHEUS, Ultron, P2P CLI.
  • [THOR] Live command palette — type "/" to see filtered slash commands inline.
AutoRL: a distributed RL environment factory | v3.7.0

Agents on the Hyperspace network can now create RL training environments for each oth
20Kviews177bookmarks167likes@varun_mathur ↗
AutoresearchAutoRL
Autoastrophysicist: distributed physics research for hyperspace travel | v3.7.7

We pointed the same autonomous peer-to-peer research loop a
6.9Kviews27bookmarks35likes@varun_mathur ↗
AutoresearchAstrophysics
Autonomous Agent-to-Agent Jobs Protocol | v4.1.0

Your agent can now post a job to the hyperspace network and have another agent pick it up,
16Kviews129bookmarks140likes@varun_mathur ↗
Agentic PaymentsAgentRankPrometheus
Agentic General Intelligence | v3.0.10

We made the Karpathy autoresearch loop generic. Now anyone can propose an optimization problem in pl
954Kviews9.3Kbookmarks5.1Klikes@varun_mathur ↗
AutoresearchAutoskillAutoquant
Autoquant: a distributed quant research lab | v2.6.9
823Kviews3.7Kbookmarks1.9Klikes@varun_mathur ↗
AutoresearchAutoquant
On Aug 27th, 2025, we presented the idea of an Agentic OS at this keynote event in San Francisco. We demo-ed what a post-IDE world looks lik
23Kviews195bookmarks159likes@varun_mathur ↗
Agentic OSAgentic PaymentsBlockchain
Autoskill: a distributed skill factory | v.2.6.5
465Kviews2.4Kbookmarks1.6Klikes@varun_mathur ↗
AutoresearchAutoskill
Hyperspace: an unmoltable peer-to-peer agent network

In 2025 we had 2.3 million unique agents just running LLMs register with their own mac
6.3Kviews42bookmarks71likes@varun_mathur ↗
AutoresearchGossip Protocol
Autosearcher: a distributed search engine

We are now insanely experimenting with building a distributed search engine utilizing the same pa
258Kviews1.1Kbookmarks829likes@varun_mathur ↗
AutoresearchAutosearcherGossip Protocol

Engineering update — 2 Thor

  • [THOR] OpenClaw P2P delegation CLI + install.sh OpenClaw detection (+759 L).
  • [THOR] OpenClaw 10x — bridge wiring, 9 API endpoints, QR pairing, marketplace, graduated access.

Engineering update — 9 Thor

Show full shiplog
  • [THOR] ATLAS-1 neural world model + THOR-1 unified MoE brain (6 modes).
  • [THOR] Multi-channel system (21 platforms) + OpenClaw sync pipeline.
  • [THOR] Channels CLI + OpenClaw coexistence + daemon --channels / --earn.
  • [THOR] OpenClaw bridge — route OpenClaw channels through Thor brain.
  • [THOR] Deep audit fixes + compute-fleet manager + native observability dashboard.
  • [THOR] Cognitive journal — human-readable memory surface for PROMETHEUS.
  • [THOR] Per-user cognitive journal (each user gets their own SUMMARY.md).
  • [THOR] 30× subsystem integration — PROMETHEUS wired into all major Thor systems.
  • [THOR] 150 % AI Agent Computer — 8 systems for beyond-vision capabilities; scorecard 50 % → 94 %.

PROMETHEUS explosion

Show full shiplog
  • [THOR] 400 K+ line cognitive AGI framework landed across 5 languages (TS, Rust NAPI, Go, Python, Lean4) — 433,674 LOC. Dozens of engines committed in parallel, including:
    • Cognitive infrastructure — task queue, capability negotiation, message bus, state machine, plan rewards.
    • Module orchestrator, causal intervention engine, proof search engine.
    • 6 MNEMOSYNE cognitive subsystems; plan learning, belief aggregation, reward models; 2 Rust crates.
    • Neural architecture search + metacognitive introspection engine.
    • Hypothesis testing, multimodal perception, spatial/belief reasoning, plan executor, MCTS.
    • Integration test harness (8/8 pass), temporal reasoning, memory reward model.
    • Lean4 proof system + chronos debugger + Python tests.
    • P2P subsystems + mental models + synthesis + gRPC proto.
    • E2E cognitive loop tests — 16/16 passing.
    • Database schemas, Docker stack, shared infrastructure.
    • Safety monitor, multimodal fusion, federation, runtime verifier, experience replay, meta-learning.
    • Polyglot expansion — Rust crates, Go services, CRDT/stream infra, plan optimizer.
    • Go mnemosyne/oracle/daedalus services, Python test suites, Lean4 math foundations.
    • Ensemble forecaster, CRDTs, stream processing, plan optimizer, tests, Lean4 category theory.
    • Linear algebra, number theory, temporal/modal logic, abstract interpretation, consensus, hybrid retrieval.
    • Separation logic verification, genetic programming evolution engine.
    • Causal scheduling, belief aggregation, fault tolerance.
    • Type theory, resource scheduler, ontology, physics, NAS, BFT.
    • Robotic control, constraint solver, crypto primitives.
    • Signal processing DSP engine + advanced model checker.
    • Cognitive attention system + episodic memory.
    • Analogical reasoning + temporal abstraction.
    • NLU pipeline, reinforcement learning, federated learning engines.
    • Information theory, game theory, HTN planning, grammar engines.
    • Graph algorithms library + automated theorem prover.
    • AEGIS AI alignment verification engine.
    • NEXUS Bayesian network engine (exact + approximate inference).
    • Optimization engine, program synthesis, causal reasoning.
    • Text analysis, knowledge graph, computer vision engines.
    • Oracle-net distributed systems engine.
    • Shared numerical methods engine.
    • ATLAS spatial reasoning with computational geometry.
    • LOGOS abstract algebra, category theory, type theory (HM inference, dependent types, algebraic effects).
    • CHRONOS temporal reasoning and scheduling engine.
    • Massive expansion — 29 K lines across 19 files.
    • Adversarial robustness, process algebra, automata theory.
    • Decision theory + NLU engines for ATLAS and AEGIS.
    • Hoare logic, conceptual spaces, multi-agent coordination (8.7 K lines).
    • Probabilistic programming (distributions, MCMC, VI).
    • Comprehensive optimization (simplex, L-BFGS, NSGA-II, GA, DE, SA, CSP).
    • Control theory (PID/LQR/Kalman/MPC/UKF) + network security (IDS/PKI/STRIDE/CVSS).
    • Real-time scheduler (EDF/RM/LLF/DVFS) + genetic programming (symbolic regression / NSGA-II) + fuzzy logic (Mamdani/Sugeno/ANFIS).
    • Workflow/saga engine + topology engine (persistent homology, TDA, Betti numbers).
    • Theorem prover (DPLL/CDCL/tableaux/resolution) + physics sim (rigid body/SPH) + federated learning (FedAvg/DP/secure agg) + memory consolidation (hippocampal replay/SWS/EWC).
    • Persistent data structures (vector/HAMT/RB-tree/skip-list) + theory of mind (BDI/false belief/deception/perspective taking).
    • MapReduce + stream processing — windowing, DAG execution, back pressure, fault tolerance.
    • Uncertainty estimation (Bayesian/conformal/OOD/calibration) + machine translation (BPE/IBM-1/phrase-based/BLEU).
    • Moral reasoning (util/deontology/virtue/fairness) + self-debugging (delta debugging/SBFL/invariants) + alignment (constitutional AI/guardrails/OOD).
    • Ecology simulator + epidemiological models for ATLAS.
    • MCTS planner for CHRONOS.
    • Symbolic execution, secure MPC, code metrics.
    • 13 PROMETHEUS engines — measure theory, learned indexes, ontology alignment, cross-modal attention, org simulation, benchmarks.
    • Temporal logic engine + RPC/protobuf framework.
    • Hippocampal replay engine for NEXUS — PER, HER, reverse replay, Dyna planning.
    • AEGIS embodied simulation + formal security verification (module complete 9/9).
  • [THOR] Polyglot final expansions — Rust oracle-crypto (OT, elliptic curves, accumulators), Rust NAPI (time series, neural nets, SMT, crypto primitives), Python chronos_ml / daedalus_ml / mnemosyne extensions / oracle_ml (knowledge trading, collective learning), Lean4 linear types.
  • [THOR] Test suites: 78 → 701 → 837 → 857 → 961 → 1,040 → 1,052 tests, all green.
  • [THOR] Close 5 critical PROMETHEUS gaps — Ultron hooks, LOGOS quickVerify, DAEDALUS trajectory, DB migration, proof signing.
  • [THOR] Close 6 PROMETHEUS integration gaps — P2P handlers, cognitive daemon hooks, HE bus wiring.
  • [THOR] LOGOS P2P proof-method names + CHRONOS peer-plan template wrapping, 15/15 integration tests pass.
  • [THOR] Distributed PROMETHEUS wiring — P2P push, HE knowledge extraction, blockchain finality.
  • [THOR] Cognitive daemon — always-on observation loop, KuzuDB knowledge graph, data-driven triggers.
  • [THOR] Thor Doctor + P2P Network Intelligence (3,198 L, 7 files).
  • [THOR] Demand-driven HuggingFace bridge + OpenRouter cross-reference seeder.
  • [THOR] Model registry + content moderation + browser peer (HuggingFace replacement).
  • [THOR] PROMETHEUS P2P bridge layer — 7 modules (5,068 L).
  • [THOR] PROMETHEUS P2P complete stack — 25,666 L, 33 files, 37 tests passing.
  • [THOR] Complete P2P routing layer — 9 modules, simulation framework, stack mount.
  • [THOR] Transport layer, QoS, stream mux, DHT storage, peer identity — P2P at 58 K lines.
  • [THOR] P2P active coordination layer — reactive gossip, task delegation, distributed cron; content policy enforcement for torrent layer.
  • [THOR] CLI P2P default-on + torrent layer in hyperspace start.
  • [THOR] Close scaffolding gaps — real hashing, pull command, signaling, binary transfer.
  • [THOR] 7 channel extensions: Matrix, Mattermost, Nostr, Nextcloud, Synology, Tlon, Zalo.
  • [THOR] Unify Chrome extension + Local VM sandbox (Layer 3) + CLI vm command.
  • [THOR] Close 4 OpenClaw gaps + enhance install UX.
  • [THOR] Migrate PROMETHEUS to PostgreSQL schema namespace.
  • [THOR] Fractal: eliminate monkey-patch concurrency bug + scope convoys by userId.
  • [THOR] Wire Chronos GFlowNet plan sampling to Python bridge; PROMETHEUS polyglot bridges end-to-end; 12 wiring integration tests (1,052 total, green).

Engineering update — 11 Thor

Show full shiplog
  • [THOR] Wire 9 unwired services + 7 P2P CLI commands + integration audit.
  • [THOR] MLX interactive chat mode with persistent engine and conversation history.
  • [THOR] Google Workspace CLI integration (gws binary wrapper + 13 tools). Fully integrate gws — 107 skills imported, MCP server wired.
  • [THOR] Shard inference engine + autoregressive ring loop for real distributed inference.
  • [THOR] Thor Web SDK — user-carried AGI for any website (MetaMask for AI).
  • [THOR] Intelligent delegation framework — 6 protocols from DeepMind paper; wire delegation framework P1–P6 into live orchestration.
  • [THOR] Browser tab distributed inference — BroadcastChannel shard transport.
  • [THOR] PROMETHEUS module kickoffs:
    • NEXUS integration kernel (Phase 1A).
    • MNEMOSYNE cognitive memory (Phase 1E).
    • ATLAS world-model engine (Phase 2).
    • CHRONOS temporal planning (34 files, 54 tests).
    • LOGOS formal verification (33 files, 10,981 lines, 88 tests).
    • DAEDALUS self-improvement (45 files, 22,459 lines, 62 tests).
    • ORACLE-NET collective intelligence (21 files, 11,983 lines).
    • AEGIS grounding & perception (18 files, 8,243 lines).
  • [THOR] Wire browser-tab distributed inference into UI, backend, dashboard.
  • [THOR] Wire federated training into CLI NodeManager — DPO + GPU worker.
  • [THOR] PROMETHEUS module registrar + integration wiring + 20-test integration suite; polyglot build infra + DB schema + CI; wire PROMETHEUS into Thor backend, pipeline, Queen, learning loop.

Engineering update — 15 Thor · 6 Chain

Show full shiplog
  • [THOR] PROMETHEUS cognitive substrate kickoff — MLX engine wired into hyperspace infer, wire Matrix-2 semantic search into Market discovery, SemanticWebCache (Webfurl-inspired DOM compression + P2P, 8,890 L), reverse-apply flow + blockchain escrow bridge for The Market, DOMChunker + 55-test SWC suite.
  • [THOR] Electron desktop-app control via CDP — IronmanAgent drives Discord, VS Code, Figma; Electron detector + controller + UI panel + CLI.
  • [THOR] Wire SWC P2P service into CLI NodeManager; hyperspace swc command.
  • [THOR] Wire llmfit hardware-fit data into Thor backend + CLI models.
  • [THOR] CLI gap fixes — computer-use, mobile, badge, keepalive, rate-limiting.
  • [THOR] Dynamic CLI port, URL validation, manual WS reconnect button.
  • [THOR] Wire MLX engine into hyperspace CLI models command.
  • [THOR] Phase A+B complete, Phase C partial, D1a browser engine.
  • [THOR] Phase C completion — GPU kernels, tensor contributor, DAO governance, PoI proofs; C5 Hierarchical Consensus participant (1,065 LOC).
  • [THOR] Daemon _daemon-loop command + ThorClient request timeouts.
  • [THOR] Phase D complete — Zero-Install Consumer Access (22,725 LOC).
  • [THOR] Phase E complete + Phase F/G partial — SDKs, tests, dashboard, enterprise; batches 2–4 add enterprise, observability, billing, deploy toolkit, Grafana, simulation, RBAC, privacy, upgrade orchestrator, quota enforcer, incident response (~36 K LOC).
  • [THOR] G4 — migration runner, model updater, feature flags (3,357 LOC).
  • [THOR] E3 complete — comprehensive intelligence test suite (5,534 LOC); 112 classification test cases, ODIN tier coverage.
  • [THOR] Bifrost browser-first routing — deep integration across core orchestration.
  • [CHAIN] C6 Proof-of-Intelligence verifier pipeline (1,256 LOC).
  • [CHAIN] AGI blockchain infrastructure — Phase B+C contracts + consensus.
  • [CHAIN] TheMarket master contract + CommitmentPool SLA staking (2,024 L Solidity).
  • [CHAIN] UTXO E2E test rewrite, deadlock fix, gnark verifier witness fix.
  • [CHAIN] Canonicalize MiMC inputs mod BN254 scalar field.
  • [CHAIN] Comprehensive website cleanup (stats, codenames, CSS, dead links).
we introduced “agentic browser” as a concept in late 2024 at 
@HyperspaceAI
, and it’s now become a default thing in AI, and in software in
3.6Kviews2bookmarks21likes@varun_mathur ↗
Agentic OSAgentic Browser
Hyperspace: Gossiping Agents Protocol

Every agent protocol today is point-to-point. MCP connects one model to one tool server. A2A delegate
134Kviews178bookmarks128likes@varun_mathur ↗
Agentic PaymentsGossip Protocol
August 20258 entries
AI-enhanced apps: specific tools, short-term horizon, help create the market

Agentic Browser: partial solution

Agentic OS: one generic too
2.3Kviews3bookmarks21likes@varun_mathur ↗
Agentic OSAgentic Browser
Thank you for coming out to the AgenticOS keynote. Full house on a weekday morning in SF! 

We stitched together the MOST ambitious vision a
15Kviews—bookmarks66likes@varun_mathur ↗
Agentic OSSummit
Hyperspace AgenticOS keynote is happening today morning in SF.

This is a technical, demo-led and profoundly new vision for the future of so
96Kviews33bookmarks133likes@varun_mathur ↗
Agentic OSSummit
hyperspace: auto-recompute every dependent agent based on changes to it’s predecessors, just like cells of a spreadsheet formula

this is th
92Kviews42bookmarks97likes@varun_mathur ↗
Agentic BrowserSummit
hyperspace - an agentic browser where you can tweak, visualize and zoom through your digital memory - while retaining full control of it on
115Kviews105bookmarks183likes@varun_mathur ↗
Agentic Browser
All of this forms part of the total Hyperspace AI OS system.

Agentic Browser
Agentic Memory
Agentic Payments

All integrated in one spatial
1.9Kviews3bookmarks10likes@varun_mathur ↗
Agentic OSAgentic BrowserAgentic Memory
July 202510 entries
Everything comes together in the Hyperspace Agentic Browser. 

One, AI-native interface: the Spatial UI. 

Here is a demo showing using the
5.5Kviews10bookmarks95likes@HyperspaceAI ↗
Agentic BrowserSpatial UI
The whole world is converging to this vision, which was rooted in UX - rejection of one-big-closed thing while embracing the network

- Agen
2.0Kviews5bookmarks28likes@varun_mathur ↗
Agentic OSAgentic Browser
On Aug 5th, join us for a special keynote presentation on the detailed product vision of the Hyperspace Agentic OS, including a live demo of
9.6Kviews3bookmarks100likes@HyperspaceAI ↗
Agentic OSAgentic BrowserBlockchain
From a high school student who dropped by The Agentic Browser Summit: 

“…at Shack15, surrounded by another group of passionate builders and
1.3Kviews—bookmarks14likes@varun_mathur ↗
communityAgentic BrowserSummit
"is another simple, yet endlessly extensible spreadsheet-like product possible which gets used by a billion people daily ?" 

It is going to
10Kviews7bookmarks93likes@HyperspaceAI ↗
Agentic BrowserSpatial UISummit
Hyperspace: The Agentic OS Apple Should Have Built

On December 19th, 2024, we announced the world’s first Agentic Browser. What followed wa
149Kviews138bookmarks185likes@varun_mathur ↗
Agentic OSAgentic BrowserAgentic Memory
The Agentic Browser Summit, tonight in San Francisco at Shack 15. 

Fireside Q&A with Robert Scoble
6.4Kviews—bookmarks72likes@HyperspaceAI ↗
Agentic BrowserSummit
The Agentic Browser Summit, tonight in San Francisco at Shack 15.
12Kviews2bookmarks76likes@HyperspaceAI ↗
Agentic BrowserSummit
The Agentic Browser Summit, tonight in San Francisco at Shack 15.
5.8Kviews—bookmarks76likes@HyperspaceAI ↗
Agentic BrowserSummit
June 20252 entries
The Agentic Browser Summit
July 15th
Shack15, San Francisco
21Kviews6bookmarks161likes@HyperspaceAI ↗
Agentic BrowserSummit
March 20254 entries
What started as a dream just ten months ago has become the fastest growing and the largest network of any kind recently. 

People from over
29Kviews16bookmarks306likes@HyperspaceAI ↗
P2PNetwork Growth
February 20252 entries
This is the fastest growing distributed peer-to-peer network since Uber.

Almost 90,000 nodes connected currently, out of ~350k nodes ever r
41Kviews36bookmarks390likes@HyperspaceAI ↗
P2PNetwork Growth
December 20242 entries
agentic browser, by hyperspace

tl;dr: answer engines are a thin-wrapper around search results and LLM APIs which don’t have data network ef
121Kviews155bookmarks218likes@varun_mathur ↗
Agentic Browser
October 20242 entries
November 20234 entries
I am a time-traveler from 2030. The rapid industrialization of AI in the mid-2020s has fundamentally transformed our society. A peak into ou
111Kviews248bookmarks290likes@varun_mathur ↗
AstrophysicsBlockchain
delivering on every aspect of this story from the future

a blockchain which can settle millions of $0.001 micropayments between agents is a
4.9Kviews3bookmarks21likes@varun_mathur ↗
Agentic PaymentsBlockchain
↑